210797 Headgate Building
Change of use from D1 (Clinic) to residential (9no. apartments). Minor elevational change to 52 St Johns Street and part change of use to ancillary use with residential conversion.
limited to the area of Colchester Cycling Campaign:
100 issues found for 'current':
Created by Steven Moseley // 1 thread
Change of use from D1 (Clinic) to residential (9no. apartments). Minor elevational change to 52 St Johns Street and part change of use to ancillary use with residential conversion.
Created by Steven Moseley // 1 thread
East Suffolk and North Essex NHS Foundation Trust (ESNEFT) are preparing two planning applications for a proposed Elective Orthopaedic Centre and Northern Approach Road access at Colchester Hospital, Turner Road, Colchester. The public is invited to comment on the development proposals in a consultation between 1 March and 12 March 2021.
The detailed elements of the works involved with the Elective Orthopaedic Centre comprise:
The detailed elements of the works involved with the Northern Approach Road access comprise:
The new Northern Approach Road access point is proposed to be located to the south‐western corner of the site, and will create a clearer, more legible and direct access for staff, patients and visitors from the strategic network in line with other local hospitals in Essex, and will provide improved highway safety and environmental benefits to residents residing along Turner Road, as well as encouraging improved sustainable travel behaviours.
More information on the plans can be downloaded here
Your views are very important to help us develop our proposals. Please use the SurveyMonkey comments form here, or alternatively email your response direct to Sam Hazell samhazell@lppartnership.co.uk
The consultation period will run from Monday 1 March 2021 until 5.00pm on Friday 12 March 2021.
Created by Steven Moseley // 1 thread
Opening in Spring 2021, the Northern Gateway Sports Park is a 76 acre site providing both indoor and outdoor sport and leisure activities.
Created by Steven Moseley // 1 thread
Alterations to car park with the erection of a freestanding restaurant with drive-thru facility, car parking, landscaping and associated works, including Customer Order Displays (COD), Goal Post Height Restrictor and Play Frame.
Created by Steven Moseley // 2 threads
The scheme will see the replacement of the double roundabouts located at Ipswich Road and Harwich Road with a single roundabout at each location. The carriageway between Ipswich Road and Harwich Road junctions will also be widened to accommodate two formal lanes in each direction. The scheme will include upgrading existing pedestrian crossings to signal controlled crossings and general improvements to the current off-carriageway cycle and footway provisions.
The scheme will improve the performance of these two key intersections on the A133 and renewal of the infrastructure will reduce maintenance costs. It will also improve the existing highway assets including the strengthening of two retaining walls, one between Ipswich Road roundabout and the adjoining railway line and another between Ipswich Road roundabout and the Waitrose Car Park. The Scheme has also supported the Cowdray Bridge refurbishment, now being progressed separately through the structures capital maintenance programme.
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 121272 for the construction of 201 dwellings.
Parcels R01, R02 & R03, G1, G3, G4 And Osf1 North Colchester Urban Ext, Mile End Road, Colchester
Created by Steven Moseley // 1 thread
Application for approval of details reserved by conditions 5, 15, 16, 17, 19, 20, 21, 22 & 23 of 193133 (Phasing, CMS, Remediation, levels, finishes, landscaping, cycles, loading.)
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use from Offices (Class B1(a)) to 10no. dwellinghouses (Class C3)
Created by Steven Moseley // 1 thread
CONVERSION OF EXISTING GROUND FLOOR D2 USE INTO 4 APARTMENTS
Created by Steven Moseley // 1 thread
Colchester based student housing developer and operator Beyond The Box, is bringing forward plans for a landmark purpose built student housing development called ‘Colne Quay’ that will transform the Hythe. The plans will open up a vacant brownfield site, provide much needed quality and well managed student accommodation and will deliver benefits to the wider community.
Before finalising our designs and submitting a planning application to Colchester Borough Council, we are sharing the proposals with the local community and inviting feedback.
This website includes key information about our proposals and an opportunity for you to leave feedback
Created by Steven Moseley // 1 thread
Full planning application for a two-storey temporary school building (640m2) and single-storey admin block (66m2) for Trinity School at Gilberd School as part of Alpha Trust including minor alterations to landscaping + hard standing.
Created by Steven Moseley // 1 thread
The ABRO site (now called the DSG) forms part of the Defence Estate and was used as a military vehicle repair facility. The site was vacated in about 2019 and has not been used since that time. The Defence Estates have decided to dispose of the site as it is no longer required for military purposes.
Created by Stuart Johnson // 1 thread
Barriers blocking shared path in Tollgate, Colchester for cyclists, wheelchairs, mobility scooters etc.
Created by Stuart Johnson // 1 thread
The new shared path that runs parallel to Severalls Lane has obstructive chicane barriers and cyclist dismount signs where the path crosses the drive to Whitehouse Farm.
Created by Steven Moseley // 1 thread
Development of 102 dwellings with associated parking, landscaping, open space, drainage and infrastructure and the formation of a vehicular access onto London Road
Created by Steven Moseley // 2 threads
"Braintree, Colchester and Tendring Councils along with Essex County Council joined together to put forward plans for three new settlements built to Garden City Principles.
The three sites based west of Braintree, on the Braintree / Colchester border and on the Colchester / Tendring border could deliver up to 43,000 new homes along the North Essex A120 corridor with significant employment opportunities and transformational new infrastructure over the next 50 years."
In May 2020 the planning inspector found the other two proposed settlements to be unsound, leaving East of Colchester as the only one of the three that could proceed.
Created by Steven Moseley // 1 thread
The Ministry of Defence (MOD) is investing in new military firing range capabilities for Colchester Garrison which will release Middlewick Ranges for disposal. This presents an opportunity for the site to contribute towards Colchester’s need for new housing, and the land has been identified in the draft Colchester Local Plan as being suitable for up to 1,000 new homes and supporting local infrastructure.
Created by Steven Moseley // 1 thread
When Northern Approach Road was built land was set aside with a view to providing segregated bus lanes in the future. It's not clear what current plans are, if any exist.
Provision for cyclists should also be made on what is an important route between the Town Centre and North Station, and the Hospital, Mile End, the A12 J28 Park and Ride, and Severalls Business Park. e.g. Cambridge's Guided Busway also has a shared use path alongside.
Created by Steven Moseley // 2 threads
Development of 153 dwellings with associated parking, landscaping, open space, drainage and infrastructure and formation of new access and alterations to existing access onto Berechurch Hall Road.
Created by Will Bramhill // 1 thread
1960s roadbuilding seared through the town. Modern road planners have already provided a good toucan crossing between Wellesley Road and Crouch Street West across Southway/Lexden Road. Providing a better ramp from Wellesley Road would help facilitate this.
Essex Housing is redeveloping the Essex County Hospital site as housing. The company has agreed various cycling measures as part of this scheme. It has allocated £25,000 towards remodelling the Wellesley Road/Creffield Road/Maldon Road junction. Gwyn Owen, head of Essex Housing, has agreed that any money left over can be put towards a new, wider ramp. There may also be funds from the Local Highways Panel.
Created by Steven Moseley // 1 thread
Thanks to planning hiccups in the 90s and 00s, there is a missing section of the path between Rouse Way and Meander Mews that prevents it from being used as an alternative for walkers and cyclists to Cowdray Avenue, or as part of leisure routes, e.g. a riverside loop.
Photograph: John Collett, Colchester Civic Society
Created by Steven Moseley // 1 thread
"Linking the A120 and A133 with a new road will unlock land to provide housing and business space, improving connectivity locally and within the wider region. It will serve a new Park and Choose site and manage traffic congestion going to Colchester Town Centre, the University of Essex and its Knowledge Gateway Technology and Research Park.
A Rapid Transit System that will prioritise public transport on a key route through Colchester. It will enable housing and business growth, allowing new and existing residents to benefit from frequent, high-quality, reliable transport connecting to the key destinations within the town. These types of system have proved successful in other towns and cities, helping create a shift away from car travel. A recently implemented example of this is the Belfast Rapid Transit Glider.
The system will service a new Park and Choose site on the proposed new community east of Colchester and help to better connect future growth areas with the rest of the town."
Created by Steven Moseley // 1 thread
Turnstone Estates is pleased to present updated plans for a state of the art leisure facility at the Northern Gateway, Colchester. We want the local community to be able to have their say in advance of a revised planning application being made to Colchester Borough Council. This is to ensure that local input can be fully considered and addressed prior to the submission of the updated application.
Created by Stuart Johnson // 1 thread
Feedback provided to ECC Highways on poor quality cycle infrastructure added to Layer Road, Colchester in Q1 2020
Created by Steven Moseley // 1 thread
This developer [1] has put up this barrier in a shared use path important to local cyclists (c.f. the Campaign's original objections), apparently following complaints that the path was being used as a “cut through” by motor cyclists.
Clearly, this constitutes a real problem for cyclists and wheelchair users.
92 threads found for 'current':
Colchester Cycling Campaign
A discussion on issue
Berechurch Hall Road Speed Limits
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
Camulodunum Way - Baronswood Way Missing Link
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212689_22ValDrive
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212507_WyvernFrm600
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212657_25Creffield
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212540_BlueOwlGtHorks
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
O/COL/01/1624_SeverallsHosp
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212506_ChesterwellDayNursery
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212490_Copford6Hses
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212479_MTroofconv
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212473_63HighSt
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212385_78NSR
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212451_56MilRd
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212338_16WBC
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212055_PPSecureCyclePark
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212418_TileHouse4Hses
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_190522_GosbecksFarm
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212350_NorfolkNSR
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212257_WBerg-shedparking
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212294_StAndAvBungalow
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212192_HeadgateDWP
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212163_DArcyCycleParking
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_202349/202161/202321/202001
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_180886_PeartreeRd
Steven Moseley
posted
Colchester Cycling Campaign
A discussion on issue
PA_212198_79MagdalenStFlats
Steven Moseley
posted
No library items found for 'current'.
No planning applications found for 'current'.